Vol 3 , Issue 4 , October - December 2015 | Pages: 135-138 | Research Paper
Received: September 25, 2015 | Revised: October 20, 2015 | Accepted: November 28, 2015 | Published Online: December 15, 2015
Author Details
( * ) denotes Corresponding author
The present chapter is devoted to study a scheduling problem with two machines arranged in series with transportation time and with the concept of equivalent item for item block. In order to transport the processed job from first machine to second there is a single transport agent, which returns empty to first machine to carry next jog after processing. Further, an optimal solution has been obtained for the scheduling problem involving weighted items and breakdown interval. The proposed algorithm has been applied on a numerical problem.
Keywords
Gas Turbine Blade; Diffusion Coating; Overlay Coating; Smart Coating and Thermal Barrier Coating.